Air Distributors

RG Air Grid

Puget Sound, WA

Location
of installation

11 mois

Project duration

103

Employees who worked
on the project

Valtech Fabrication fabricated an Air Grid for the FCCU regenerator at a refinery in Washington state, USA.

The grid is made of twenty (20) distribution arms and nine hundred (900) nozzles.