Heads and Vessels

Reactor Vessel

Detroit, MI

Location
of installation

14 months

Project duration

125

Employees who worked
on the project

In 2017-2018, Valtech Fabrication built the reactor vessel for the FCC unit in a Detroit, MI oil refinery.

The vessel, including the refractory and all internal equipment, was fabricated and fully assembled in the Valtech shop.

The total weight of the assembled piece was 263 MT.