Heads and Vessels

Reactor Vessel

Detroit, MI

Location
of installation

14 months

Project duration

125

Employees who worked
on the project

In 2017-2018, Valtech Fabrication built the reactor vessel for the FCC unit in a Detroit, MI oil refinery.

The vessel, including the refractory and all internal equipment, was fabricated and fully assembled in the Valtech shop.

The total weight of the assembled piece was 263 MT.

Change my preferences
+

We use cookies to facilitate your navigation and enable certain features. You can see detailed information about all cookies in each consent category below.

Functional cookies (Required)

These cookies are essential for the proper functioning of our website; that’s why you can’t delete them.

Statistical cookies

These cookies allow us to know the use made of our site and its performance, to establish usage statistics and to determine the volumes of attendance and use of the various elements.

Advertising cookies

These cookies are used to provide visitors with personalized advertisements based on previously visited pages and to analyze the effectiveness of the advertising campaign.

Reject
Confirm my selection
Cookies

This site uses cookies, deposited by our website, in order to improve your browsing experience. For more information on the purposes and to customize your preferences by type of cookies used, please visit our privacy policy page.

Accept all
Manage my preferences